biothane dog collars

Manchester Terrier Long Lines

£12.00

Width * 

Length * 

Metal colour * 

This long line enables your dog to explore with safety. It is made from either 1/2″ or 5/8″ BETA Biothane®. They are ideal for training young dogs, when learning recall, or older dogs who are likely to have selective deafness !

It is available with 3 options for the handle. Option 1 No handle. Option 2 A sewn  handle. Option 3 a clever design allows you to have a handle for walking and no handle when the dog is loose.

The clip end is both sewn and riveted for strength.

It is supple and warm in your hands, and requires no maintenance, no matter how wet and muddy it gets.

It can be ordered with either brass, or stainless steel clips, so will not rust.

This long line to enable your dog to explore with safety.  They are idea for training young dogs, when learning recall, or older dogs who are likely to have selective deafness ! A clever design allows you to have a handle for walking and no handle when the dog is loose.

Beta Biothane is the best choice for long lines, as it is more supple and offers better grip than the opaque or translucent.

12 mm  is the best width for Manchesters

It is supple and warm in your hands, and requires no maintenance, no matter how wet and muddy it gets.

It can be ordered with either brass, or stainless steel clips, so will not rust.

Weight0.4 kg

Reviews

There are no reviews yet.

Be the first to review “Manchester Terrier Long Lines”

Your email address will not be published. Required fields are marked *

Manchester Terrier Long Lines

Share on facebook
Share on google
Share on twitter
Share on linkedin
SKU manchester-terrier-long-lead Categories ,
0